CONSIDERATION OF APPROVAL OF A MILLS ACT CONTRACT FOR THE PROPERTY LOCATED AT 1500 ROLLIN STREET

 

Recommendation

It is recommended that the City Council review the proposed Rehabilitation and Repair Work Plan and approve a Mills Act contract with the owners of 1500 Rollin Street.

 
Executive Summary

The owners of 1500 Rollin Street request a Mills Act contract to support preservation of their 1910 Craftsman bungalow, a contributor to the locally designated Rollin Craftsman Cluster District. The proposed Rehabilitation and Restoration Plan ("work plan") identifies four rehabilitation projects totaling $171,000: foundation anchoring and structural stabilization; replacement of knob-and-tube wiring; rehabilitation of exterior wood features; and repairs to historic brickwork and concrete porch components. Completion dates range from 2027 through 2033.

 

The proposed improvements address documented structural, electrical, and material deficiencies while retaining the residence’s historic character. On August 20, 2026, the Cultural Heritage Commission (CHC) voted 4-0 to recommend approval.

 
Background

On January 7, 2026, a letter of intent to submit a Mills Act application for the property located at 1500 Rollin Street was filed with the City.

 

On March 19, 2026, the letter of intent was presented to the Cultural Heritage Commission and a subcommittee was appointed to review the request in further detail. Commissioner Carlblom and Commissioner Aperlo were appointed to be on the subcommittee.

 

On April 14, 2026, the Subcommittee and staff conducted an on-site visit to inspect the condition of the property.

 

On April 24, 2026, a formal Mills Act application (Attachment 1) was filed by the Applicant Debi Howell-Ardila.

 

On May 21, 2026, the Cultural Heritage Commission reviewed the proposed Mills Act Application for 1500 Rollin St.

 

On August 20, 2026, the Cultural Heritage Commission reviewed the Mills Act application and voted 4-0 in recommending that the City Council enter into a Mills Act contract.

 
Analysis

Constructed in 1910, the one-story Craftsman bungalow contributes to the Rollin Craftsman Cluster District, designated by the City Council in June 2020. According to the application, its California Historical Resources Status Code is 5B1, identifying a contributor to a locally designated historic district that is also eligible for individual local listing. Its district contributor status establishes the basis for consideration under the City’s Mills Act program; the application does not identify the property as a National Register resource.

 

Character-defining features include the low-pitched cross-gabled roof, wide eaves and exposed rafter tails, wood siding and shingles, full-width front porch, wood trellis supported on brick piers, decorative wood windows, and brick chimney with clinker-brick detailing. The work plan is intended to retain and repair these features while improving structural stability and building safety.


A Mills Act contract provides a property tax incentive in exchange for the owner’s commitment to preserve a qualifying historic property and complete an approved work plan. The agreement incorporates the approved scope, completion dates, and reporting requirements as enforceable obligations. Contract approval does not replace required permits or Certificates of Appropriateness.

 

Proposed Scope of Work

The Rehabilitation and Restoration ("work plan") prepared by Debi Howell-Ardila ("applicant") documents missing foundation anchors, outdated wiring, deteriorated exterior wood, and damaged masonry and concrete. Table 1 summarizes the four rehabilitation projects and their preservation purposes. Costs are applicant estimates rather than fixed construction prices.

 

The schedule prioritizes structural and electrical improvements in 2027, followed by exterior wood rehabilitation in 2030 and masonry and concrete repairs in 2033. All four projects are scheduled within the first ten years of the proposed contract.

 

Table 1- Summary of Rehabilitation and Repair Work Plan

Proposed work plan and preservation purpose Estimated Cost Completion
1. Foundation anchoring and structural stabilization. Install anchor bolts, foundation plates, and other connections as needed to secure the house, girders, and rim joists. Use qualified structural engineering services and avoid damage to character-defining features. $34,000 2027
2. Electrical upgrades. Replace original knob-and-tube wiring and address damaged insulation and wiring in contact with attic insulation. Use qualified contractors to address fire and life safety hazards while protecting historic materials. $28,000 2027
3. Exterior wood rehabilitation. Repair siding, shingles, exposed rafter tails, the wood door, and porch trellis. Retain sound material; use matching in-kind replacements only where repair is infeasible. Prepare surfaces gently and apply compatible finishes or a period-appropriate paint palette. $71,000 2030
4. Brickwork and concrete repairs. Repair and repoint the historic chimney and brick trellis supports; repair concrete pier caps and porch landing components as described in the work plan. Use compatible mortar, retain historic brick, and match original profiles and finishes where replacement is necessary. $38,000 2033
Total proposed rehabilitation investment $171,000  

 

Treatments would follow the Secretary of the Interior’s Standards for Rehabilitation. The application specifies gentle surface preparation, retention of original material, compatible coatings and mortar, and matching replacements where repairs are infeasible. It excludes power washing and machine sanding of historic wood, as well as abrasive masonry cleaning.

 

Recurring termite, roof, and paint inspections are identified separately as owner stewardship activities. They are not included in the $171,000 rehabilitation total. Roof repairs already underway in April 2026 are also excluded from the qualifying investment.

 

Evaluation of Mills Act criteria

SPMC Section 2.68(b)(1)(C) establishes six criteria for evaluating a proposed Mills Act contract, which are: (1) financial investment; (2) public benefit; (3) retroactive limitations; (4) maintenance work limitations; (5) interior work limitations; and (6) landscape work limitations. The Cultural Heritage Commission considered the listed criteria in their evaluation of the Work Plan and accepted the analysis below as basis for the recommendation to the City Council for approval of the Mills Act contract for 1500 Rollin Street. 

 

Criterion (i) Financial Investment. The estimated tax benefit is not expected to exceed the applicant’s proposed financial investment in the cultural resource over the first 10 years of the contract.  

 

Criterion (i) requires that the estimated tax benefit not exceed the applicant’s proposed financial investment in the cultural resource over the first ten years of the contract. The four proposed rehabilitation projects total $171,000, exceeding projected ten-year property tax savings of approximately $168,654 by $2,346. The financial analysis is included in the Mills Act Application (Attachment 1). Therefore, criterion (i) is met.

 

Criterion (ii) Public Benefit. The proposed Mills Act contract features a work plan that will provide a benefit to the public by: rehabilitating the property for continued occupancy or adaptive reuse; improved viability through systems upgrades and structural reinforcement upgrades; preserving and maintaining the character-defining features of the property, and/or restoring character-defining features of the property that have been significantly altered or removed over time.  

 

Criterion (ii) requires a work plan that benefits the public through continued occupancy or adaptive reuse, improved viability through building system and structural upgrades, or preservation and restoration of character-defining features. The home was built in 1910. The proposed foundation anchoring would improve stability, and electrical upgrades would address documented hazards. Repairs to the wood siding, shingles, trellis, brick chimney, and porch components would preserve the residence’s contribution to the historic district. These improvements support continued residential use and preservation of the City’s historic character. Therefore, criterion (ii) is met.

 

Criterion (iii) Retroactive Limitations. The estimated tax benefit will not be used for any maintenance or alteration work that was previously completed or initiated before the contract is approved, unless it can be shown that the completed work was necessary in the interest of the public health or safety following involuntary damage or destruction caused by fire, act of nature, or any other casualty.

 

Criterion (iii) restricts use of the estimated tax benefit for work completed or initiated before contract approval, except for qualifying work following involuntary casualty damage. The application identifies roof repairs as underway in April 2026 and expressly excludes those expenses from the financial analysis. The four budgeted projects are presented as future work. Therefore, criterion (iii) is met. 

 

Criterion (iv) Limitations on Maintenance. The estimated tax benefit will not be used for routine maintenance work except for exemplary or exceptional properties that have financially burdensome maintenance requirements.

 

Criterion (iv) restricts routine maintenance expenditures unless an applicable exception is established. The exterior wood and masonry projects address documented deterioration and include refinishing as part of rehabilitation. These costs are distinguished from ordinary cyclical painting, inspections, and routine repairs. No maintenance exception is requested. The final work plan totals $171,000 and consists of qualifying rehabilitation expenditures and excludes routine maintenance. Therefore, criterion (iv) is met.

 

Criterion (v) Limitations on Interior Work. The estimated tax benefit will not be used for work within the interior of a cultural resource unless the commission determines the following exceptions should be made: the interior work is necessary to improve the structural integrity of the property; the interior work is necessary to preserve and maintain character-defining features within the cultural resource that are specifically identified as part of the official landmark nomination; and/or the interior work is necessary to preserve and maintain character-defining features of the property that were discovered subsequent to its landmark designation. The commission must first determine that those interior features are character-defining based on substantial evidence provided by the applicant.  

 

Criterion (v) limits interior work to specified exceptions, including work necessary to improve structural integrity and work preserving qualifying character-defining interior features. Additionally, the electrical systems upgrade will avoid damage to historic features and is identified in Criterion ii as a benefit to the public. Therefore, criterion (v) is met.

 

Criterion (vi) Limitations on Landscaping. The estimated tax benefit will not be used for landscaping work unless it will be used for specific landscape features that were identified as part of the official landmark nomination.  

 

Criterion (vi) limits landscaping expenditures to qualifying features identified in the official landmark nomination. The four proposed rehabilitation projects do not include landscaping. Therefore, criterion (vi) is met.

 

Staff supports the proposed contract because the application identifies specific preservation needs, assigns costs and completion dates, and proposes treatments intended to retain historic materials. 

 
Alternatives

Alternatively, the City Council may continue the item to obtain clarification of eligible expenditures, revised financial calculations, or a revised work plan, or decline to approve the contract.

 
Fiscal Impact

The application projects approximately $168,654 in owner property tax savings over ten years. The City's share is 26% of the reduction. The estimated reduction in City property tax revenue would be approximately $43,650 over ten years, or an annual average of $4,365. Actual savings and revenue effects would depend on the County Assessor’s valuation and applicable tax calculations.

 

The proposed rehabilitation work would be privately funded. The City’s reduced property tax revenue would support a contractual preservation commitment rather than a direct City payment for construction.

 
Key Performance Indicators and Strategic Plan

Progress would be evaluated against completion of work items identified in the Rehabilitation and Restoration Plan ("work plan"). As identified in the contract, the property owner will be required to submit a progress report to staff every three years. The report will document completed and pending tasks, expenditures, photographs, and applicable permits and Certificates of Appropriateness. However, staff has implemented a monitoring program for all active Mills Act Contracts and will take a proactive approach moving forward starting with quarterly check ins with contract owners to ensure compliance in addition to the required three year progress reports. Separately, the Cultural Heritage Commission will provide an annual report to City Council on its review of all active Mills Act contracts. The agreement provides a schedule for City review and follow-up on overdue work.

 
Commission Review and Recommendation

On August 20, 2026, the Cultural Heritage Commission reviewed the Mills Act application and voted 4-0 to recommend that the City Council enter into a contract with the owners of 1500 Rollin Street. The recommendation followed subcommittee review and the April 14, 2026 site visit.

 
Public Notification

The community has been notified of this consent calendar item via a posting of the agenda on the City website on November 12, 2026.

 
Environmental Analysis

In accordance with the California Environmental Quality Act (CEQA), the project qualifies for an exemption under the California Environmental Quality Act (CEQA) Guidelines Section 15308, Class 8: Actions taken by regulatory agencies, as authorized by state or local ordinance, to assure the maintenance, restoration, enhancement, or protection of the environment where the regulatory process involves procedures for protection of the environment.  

 

Class 8 exemptions apply to actions taken by regulatory agencies, as authorized by state law or local ordinance, to assure maintenance, restoration, enhancement, or protection of the environment where the regulatory process involves procedures for environmental protection. The Mills Act contract is a regulatory tool to promote the preservation of historical resources. Approval of the contract will result in the long-term protection and maintenance of a designated historic resource, contributing to the preservation of the City’s cultural and architectural environment. There are no unusual circumstances that would result in a significant environmental impact.

 