REQUEST FOR ACTION

Bid Advertisement – City Ponds 100, 113, and 199 Pond Dredging and Restoration Project – Project No. J6748-1

 
MEETING DATE:
September 9, 2026
ORIGINATING DEPT:
Public Works
 
AGENDA SECTION:

Consent Agenda

PRESENTER:
Aaron Luckstein
 
Action Requested:

Authorizing the advertisement for bids for City Ponds 100, 113, and 199 Pond Dredging and Restoration Project – Project No. J6748-1.

Report Narrative:

City Ponds 100, 113, and 199, which are known as Manorwoods Pond, Greystone Pond, and Georgetown Pond, respectively, have reached their sediment storage capacity and require dredging to restore their overall function. Manorwoods Pond is located in the southeast quadrant of 7th Street NW and Lake Street NW. Greystone Pond is located south of Wicklow Lane SW and east of Greystone Lane SW. Georgetown Pond is located south of 55th Street NW and east of Georgetown Drive NW. Each stormwater pond has been in operation for 26 years or more. Sediment removal is necessary to restore their water quality treatment effectiveness of stormwater runoff generated within their respective drainage areas. To further improve water quality treatment and bring the stormwater ponds into compliance with current city standards, it is also proposed to update the outlet control structures for each pond to enhance the water quality treatment functions of them. The amount of sediment needed to be removed from these ponds along with the outlet control structure updates exceeds the workload capacity of the Public Works Team.

All ponds are located on large City-owned parcels adjacent to residential neighborhoods. Therefore, all adjacent and affected residents will be notified prior to construction commencing to inform them of the project scope, schedule, potential impacts, and contact information of city representatives.

 

To ensure timely completion and cost efficiency, Public Works recommends outsourcing this work for public bid. The proposed project is in the final stages of design, and the bid release and subsequent opening will occur as soon as the design phase is complete. Approval of this authorization allows for publishing the advertisement for bids upon receipt of the completed design. The bids will then be brought back to the council for consideration of a resulting construction contract.

Priorities & Foundational Principles:
Responsible Environmental Stewardship
Public Safety
Policy Considerations & DEI Impact:

The proposed project is consistent with City policies, maintenance requirements, and design standards related to storm water conveyance and water quality treatment.

Prior Legislative Actions & Community Engagement:

No prior legislative actions and community engagement. All adjacent and affected residents will be notified prior to construction commencing to inform them of the project scope, schedule, potential impacts, and contact information of city representatives.

Fiscal & Resource Impact:

City Ponds 100, 113, and 199 Pond Dredging and Restoration Project – Project No. J6748 will be funded from the 2026-2031 Storm Water Capital Improvement (CIP), Map No. 3, J6503 Annual Program: Funding for Stormwater Management Facility Rehabilitation and Repair. Funding is sourced from the Storm Water Utility Enterprise Fund. The preliminary engineer’s estimate of probable cost including a 30 percent allowance for engineering, interest, and contingency is $594,790.36.

Alternative Action(s):

No alternative actions are suggested at this time.

Prepared By:
Jacob Souhrada
Attachments:
Project Location Map - City Ponds 100, 113, and 199 Pond Dredging and Restoration Project - Project No. J6748-1