PUBLIC WORKS DEPARTMENT - A. GONZALEZ
1. Approve contract amendment # 11 with NV5, Inc. (formerly Nolte & Associates, Inc.), to extend the contract term through December 31, 2027 with no changes to scope or cost, to provide Geotechnical and Environmental services related to the Replacement of Anzar Road Bridge over San Juan Creek; and
2. Authorize the Chair, County Executive Officer, or designee to approve the said Contract Amendment.
SBC FILE NUMBER: 105.3
CONSENT AGENDA
The project proposes to replace the existing Anzar Road Bridge over San Juan Creek. The project site is located on Anzar Road between U.S. Highway 101 and San Juan Highway, approximately 2.4 miles northwest of the City of San Juan Bautista in San Benito County. The existing bridge is approximately 22 feet wide and 40 feet long, two-span, reinforced concrete slab structure with reinforced concrete wall piers and abutments that was built in 1935. The existing bridge does not meet current design or seismic safety standards and is considered functionally obsolete. The replacement bridge would be located along the same alignment as the existing bridge. The existing bridge would be removed, and a new bridge would be constructed in its place. The new bridge would consist of a single cast-in-place, post-tensioned concrete slab, supported on concrete abutment walls at each end. The new bridge would be 32 feet in width to accommodate two 12-feet wide lanes and two 4-feet wide shoulders. The new bridge would be approximately 56 feet in length and would have a road profile approximately 2 feet higher than that of the existing bridge.
The original contract for $314,238.00 was approved following an RFP process, on June 19, 2012. The first amendment was increased by $13,714.00 for a total of $327,952.00, for additional services and reports regarding a Phase I Initial Site Assessment update, construction noise survey and an asbestos & lead-based paint survey and was approved on June 4, 2013. The project was placed on hiatus in 2014. The second amendment was increased by $35,286.00 for a total of $363,238.00, for additional engineering and environmental services related to changes in the project description and updated Central Coast Regional Water Quality Control Board requirements and was approved on June 28, 2016. The third amendment was to extend the contract term at no additional cost and was approved on June 12, 2018. The fourth amendment was increased by $150,000.00 for a total of $513,238.00, for additional engineering design and environmental services related to changes in the project description, updated Caltrans Standard Specifications, and the regulatory agency permit process and was approved on August 7, 2018. The fifth amendment was to extend the contract term at no additional cost and was approved on May 21, 2019. The sixth amendment was to extend the contract term at no additional cost and was approved on October 29, 2021. The seventh amendment was increased by $61,150.00 for a total of $574,388.00, for additional engineering design and environmental services related to changes in the project description, updated Caltrans Standard Specifications, and the regulatory agency permit process and was approved on September 27, 2022. The eighth amendment was to extend the contract term at no additional cost and was approved on December 07, 2023. The ninth amendment was increased by $97,421.00 for a total of $671,809.00, for additional geotechnical design and environmental clearance services, due to changes in the project description, updated Caltrans Standard Specifications, and the regulatory permit process and was approved on May 7, 2024. On August 12, 2025, the board approved amendment #b 10 to add $178,535.00 to the contract and increase the total to an amount not to exceed $850,344.00, to provide additional engineering design and environmental services required to complete the scour analysis, geotechnical evaluation, bridge re-design, and environmental clearance tasks. This amendment # 11 is to extend the contract term through December 31, 2027 with no changes to the Cost or Scope of the original contract.
| NV5 Inc (Nolte Associates Inc) - Anzar Road Bridge Replacement Project (RMA-2027-000-06) | ||||||
| Contract | Additional Amount | Total Amount | Expiration Date | Approved By | Approval Date | Reason for Contract / Amendment |
| Original | - | $314,238.00 | 06/30/2016 | BOS | 06/19/2012 | Anzar Road Bridge Replacement Project - Geotechnical and Environmental services |
| Amendment # 1 | $13,714.00 | $327,952.00 | 06/30/2016 | BOS | 06/04/2013 | Additional Scope: Site Assessment update etc. |
| Amendment # 2 | $35,286.00 | $363,238.00 | 06/30/2018 | BOS | 06/28/2016 | Additional Scope: CCRWQC Board requirements |
| Amendment # 3 | - | $363,238.00 | 06/30/2019 | BOS | 06/12/2018 | Term Extension Only |
| Amendment # 4 | $150,000.00 | $513,238.00 | 06/30/2019 | BOS | 08/07/2018 | Additional Scope: Updated Caltrans Specs, Permit Process etc. |
| Amendment # 5 | - | $513,238.00 | 11/01/2021 | BOS | 05/21/2019 | Term Extension Only |
| Amendment # 6 | - | $513,238.00 | 12/31/2022 | BOS | 10/29/2021 | Term Extension Only |
| Amendment # 7 | $61,150.00 | $574,388.00 | 12/31/2023 | BOS | 09/27/2022 | Additional Scope: Updated Caltrans Specs, Permit Process etc. |
| Amendment # 8 | - | $574,388.00 | 06/30/2024 | CAO | 12/07/2023 | Term Extension Only |
| Amendment # 9 | $97,421.00 | $671,809.00 | 06/30/2024 | BOS | 05/07/2024 | Additional Scope: Updated Caltrans Specs, Permit Process etc. |
| Amendment # 10 | $178,535.00 | $850,344.00 | 12/31/2026 | BOS | 08/12/2025 | Additional Scope: Scour Analysis, Geotechnical Evaluation, Bridge re-design etc. |
| Amendment # 11 | - | $850,344.00 | 12/31/2027 | BOS | (11/17/2026) | Term Extension Only |
Anzar Road Bridge project is budgeted for $1,000,000.00 for FY2026-2027 under Highway Bridge program which is funded by FHWA. Since there are no changes to the contract cost, there will be no financial impact to FY 2026-27 budget.
Budget Line Item #: 210.70.2020.1211.650.201
1. Approve contract amendment # 11 with NV5, Inc. (formerly Nolte & Associates, Inc.), to extend the contract term through December 31, 2027 with no changes to scope or cost, to provide Geotechnical and Environmental services related to the Replacement of Anzar Road Bridge over San Juan Creek; and
2. Authorize the Chair, County Executive Officer, or designee to approve the said Contract Amendment.
