Item Number: 1.21
MEETING DATE:
11/17/2026
 
DEPARTMENT:
RESOURCE MANAGEMENT AGENCY
 
AGENDA ITEM PREPARER:
Ramesh Pandurangan
 
DEPT HEAD/DIRECTOR:
Adolfo Gonzalez
 
 
SUBJECT:


PUBLIC WORKS DEPARTMENT - A. GONZALEZ
1. Approve Amendment #3 with Dewberry Engineering, Inc. to extend the contract term through December 31, 2027 with no changes to scope or cost to provide services related to environmental review of the County's Public Works Infrastructure Project, namely the Carr Avenue Bridge Replacement Project, in compliance with the requirements of the California Environmental Quality Act ("CEQA"), CEQA Guidelines, and the County's Implementing Procedures for CEQA; and
2. Authorize the Chair, County Executive Officer, or designee to approve the said Contract Amendment.
SBC FILE NUMBER: 105.3

 
AGENDA SECTION:


CONSENT AGENDA

 
BACKGROUND/SUMMARY:


The Carr Avenue bridge was in need of a replacement. To achieve that goal, environmental analysis was needed to be completed to assess the potential impacts to the environment that could be caused by the construction of the new bridge.Dewberry Engineering Inc. (Dewberry) began that environmental analysis in early 2020 based on a preliminary design of bridge construction. Subsequent to that analysis, the County switched design firms which paused the efforts of Dewberry.  

 

The new design firm, Kimley-Horn produced a bridge design that has a slightly different alignment with results in a different environmental impact footprint. Consequently, a new biological survey was required to be completed. Additionally, updates and revisions were required for the other previously completed environmental documents. Also, some aspects of CEQA had changed and needed to be addressed in the analysis. During the pause in design and the switchover to a new design firm, Dewberry's prior contract expired. Consequently, a new contract was created in 2023.  

 

On June 27, 2023, the board approved the new contract in the amount of $112,839.50, for a contract term of June 27, 2023 through December 31, 2024.

 

On December 13, 2024, the deputy CAO approved amendment # 1 to extend the contract through December 31, 2025 with no changes to the original Cost or Scope of the contract.

 

On May 12, 2026, the board approved amendment # 2 to extend the contract through December 31, 2026 with no changes to the Cost or Scope of the original contract. 

 

This amendment # 3 is to extend the contract term through December 31, 2027 with no changes to the Cost or Scope of the original contract.

 

Dewberry Engineering Inc. - Carr Ave Bridge Replacement Project (RMA-2027-000-02)
Contract Additional Amt Total Amount Expiration Date Approved By Approval Date Reason for Contract / Amendment
Original - $112,839.50 12/31/2024 BOS 06/27/2023 Environmental Consultation  & CEQA Compliance
Amendment # 1 - $112,839.50 12/31/2025 CAO 12/13/2024 Term Extension Only
Amendment # 2 - $112,839.50 12/31/2026 BOS 05/12/2026 Term Extension Only
Amendment # 3 - $112,839.50 12/31/2027 BOS (11/17/2026) Term Extension Only

 

 
FISCAL IMPACT:


Carr Avenue Bridge Replacement project is budgeted for $700,000.00 for FY 2026-2027 under Measure G Funds.

Budget Line Item # 210.70.2270.1000.619.220

 
STAFF RECOMMENDATION:


1. Approve Amendment #3 with Dewberry Engineering, Inc. to extend the contract term through December 31, 2027 with no changes to scope or cost to provide services related to environmental review of the County's Public Works Infrastructure Project, namely the Carr Avenue Bridge Replacement Project, in compliance with the requirements of the California Environmental Quality Act ("CEQA"), CEQA Guidelines, and the County's Implementing Procedures for CEQA; and
2. Authorize the Chair, County Executive Officer, or designee to approve the said Contract Amendment.

 
ATTACHMENTS:
Board Agenda Fact Sheet - Dewberry Engineering Amendment #3 - Carr Ave.
RMA-2027-000-02 - Dewberry Engineering - AM 3 - Carr Ave Bridge Replacement - Exp. 12.31.27