BOARD MEMBERS:

DISTRICT 1 - Dom Zanger
DISTRICT 2 - Kollin Kosmicki
DISTRICT 3 - Mindy Sotelo
DISTRICT 4 - Angela Curro
DISTRICT 5 - Vacant
San Benito Logo

Agenda Item
Regular Meeting of the
Board of Supervisors
Tuesday, November 17, 2026

Website:
www.sanbenitocountyca.gov
COUNTY EXECUTIVE OFFICER:
Esperanza Colio Warren

COUNTY COUNSEL:
Gregory P Priamos

CLERK OF THE BOARD:
Vanessa Delgado
 

Item Number: 1.27
MEETING DATE:
11/17/2026
 
DEPARTMENT:
RESOURCE MANAGEMENT AGENCY
 
AGENDA ITEM PREPARER:
Ramesh Pandurangan
 
DEPT HEAD/DIRECTOR:
Adolfo Gonzalez
 
 
SUBJECT:


PUBLIC WORKS DEPARTMENT - A. GONZALEZ
1. Approve retroactive Amendment # 2 with Mesiti Miller Engineering (MME), to extend the contract term through June 30, 2027 to provide Consulting Services related to the County's Public Works Infrastructure Projects; and
2. Authorize the Chair, County Executive Officer, or designee to approve the said Contract Amendment.
SBC FILE NUMBER: 105.3

 
AGENDA SECTION:


CONSENT AGENDA

 
BACKGROUND/SUMMARY:


Resource Management Agency (RMA) Department released a Request for Qualifications for on-call engineering services in 2021. These companies provide specific technical knowledge and abilities that county currently does not have. Many of our improvement programs and grant opportunities are directly linked to the ability that this arrangement provides. The Resource Management Agency released RFQ No. PW2021-002 for qualified engineering consultants to provide the County with On-Call Engineering services for projects that may include, but are not limited to, road reconstruction, road widening, bridge replacement, bridge rehabilitation, bike/multipurpose paths, traffic signal design, traffic calming, hydraulic analysis, material testing, geotechnical investigations, surveying, and the preparation/performance of public infrastructure reports and studies.
These services are being funded through various State and Federal grant programs, SB1, and Measure G.

 

RMA received 16 qualified proposals and completed the consultant selection process. As a result RMA selected the following five (5) consultants to execute contracts with the County:
Kimley-Horn and Associates, Inc.
TRC Engineers, Inc.
Mesiti Miller Engineering (MME Civil + Structural Engineering)
Wallace Group
San Benito Engineering & Surveying, Inc.

 

RMA entered into a contract with Mesiti Miller Engineering (MME) for $500,000.00 for the term of July 1, 2021 through June 30, 2024, with an automatic renewal for two (2) successive one (1) year periods (July 1 – June 30) and under the same terms and conditions for a total term of five (5) years to provide consulting services related to On-Call General Civil and Transportation Engineering, Structural Engineering, Geotechnical Engineering and material testing, Construction Engineering, and Surveying Support Services through a Consultant Service Agreement for various Public Work Projects.
This contract enabled RMA to keep up with growing demand and workload.

 

On April 7, 2022, the CAO approved amendment # 1, to include clarification regarding the payment terms specified in the original contract and no other changes were made to the contract.

 

This amendment # 2 is required, to extend the contract for an additional year until 06/30/2027 and there are no changes to the cost or scope of the contract.

 

Mesiti Miller Engineering (MME) - On Call Services for Engineering Consultant
Contract Additional Amt Total Amount Expiration Date Approved By Approval Date Reason for Contract / Amendment
Original   $500,000.00 06/30/2026 BOS 06/22/2021 On-Call services for General Civil, Transportation, Structural and Geotechnical Engineering 
Amendment # 1 $0.00 $500,000.00 06/30/2026 CAO 04/07/2022 Clarification regarding payment terms
Amendment # 2 $0.00 $500,000.00 06/30/2027 BOS (11/17/2026) Term Extension Only until existing project (San Juan Highway improvements) will be closed out.

 

 

 
FISCAL IMPACT:


San Juan Highway Improvements is budgeted for FY2026-2026 (General Fund = $1M, and Measure G = $400,000.00 for a total budget of $1.4M). 

Budget Line Item # 210.70.2275.1000.650.201 (General Fund and Measure G Fund)

 
STAFF RECOMMENDATION:


1. Approve retroactive Amendment # 2 with Mesiti Miller Engineering (MME), to extend the contract term through June 30, 2027 to provide Consulting Services related to the County's Public Works Infrastructure Projects; and
2. Authorize the Chair, County Executive Officer, or designee to approve the said Contract Amendment.

 

 
ATTACHMENTS:
Board Agenda Fact Sheet - Mesiti Miller Engineering Amendment #2
RMA-2026-000-14 - Mesiti Miller Engg (MME) - AM 2- OC Engg PW Projects - Exp. 06.30.27