AGENDA SUBJECT:

Drainage Design Options for Phase 3 of Flying Fortress Parkway

 

 
SUMMARY:

The City has received the 95% design plans for the third phase of Flying Fortress Parkway. Stormwater detention or retention is required to maintain pre-existing downstream flow conditions. This report will present three options. Option A is the current design, which includes a series of 15 detention basins adjacent to the parkway in the road right-of-way. Option B would be to construct stormwater detention on the City property away from the parkway, just north of Berry Road. Option C would be to construct stormwater detention upstream of the parkway on donated land.

 
FISCAL IMPACT:

There could be a cost impact to the project depending on which option is selected.

 
STAFF RECOMMENDATION:

Council discretion

 
SUGGESTED MOTION:

Council discretion to proceed based on options proposed.

Option A: Proceed as designed with the cascading detention basins. 

Option B: Proceed with change in plans to establish two temporary basins on city owned property. 

Option C: Proceed with pursuing an agreement for Off-Site Retention Basin near Rattlesnake Wash. 

 
ATTACHMENTS:
FFP3_DrainageOptions Final.pdf
Options.pdf