Agenda Item Report
Legislative Board: Buda Economic Development Corporation
Date: September 14, 2026
Contact: Shannon Cameron, Office Manager
Agenda Item ID / Number: 2026-754 / 7.5
 
ITEM TITLE:

Discussion and possible action to authorize the Board President to amend the agreement with Logic Builders for additional site improvements and building renovation, not to exceed additional expenditures of Seven Hundred Fifteen Thousand and No/100 Dollars ($715,000.00), related to Project Caboose/Train Depot and concrete work and related budget amendment. 

 
 
1. EXECUTIVE SUMMARY

Staff is requesting Board authorization to amend the agreement with Logic Builders for additional site improvements and building renovation, not to exceed $715,000, related to Project Caboose/Train Depot and sculpture base installation in Buda City Park, along with the related budget amendment. This brings the New Total Project Cost to $3,815,000, driven by five new cost items: culverts under the driveway, a lift station and water/wastewater line increase, a fire sprinkler system to protect the asset, the sculpture base, and a permanent power contingency, totaling $710,463.37 before rounding. The City opted not to fund the fire sprinkler system despite the Depot ultimately being a City-owned asset, leaving that cost to the EDC. Of the $715,000 requested, $469,613.37 covers City-driven additions (design contribution and joint commission additions) that the City will reimburse to the EDC, leaving a net cost to the EDC of $240,850. Staff recommends approval of both the contract amendment and the corresponding $715,000 budget amendment to keep the project on schedule and fully funded through completion.


 
2. BACKGROUND/HISTORY

The Depot on Main (Project Caboose) is a historic depot renovation led by Logic Builders, with a previously authorized EDC budget of $3,100,000 built up through prior amendments dating back to February 2025. Since that authorization, a joint meeting with the City identified additional scope, including fencing and electric outlets for vendors, along with new construction requirements for culverts under the driveway, a lift station and water/wastewater line increase, a fire sprinkler system, a sculpture base for installation in Buda City Park, and a permanent power contingency. The City has agreed to contribute $400,000 toward design and to cost-share the joint commission additions, but declined to fund the fire sprinkler system despite the Depot ultimately being a City-owned asset. These combined additions bring the New Total Project Cost to $3,815,000, requiring a budget amendment and a corresponding increase to the Logic Builders agreement.


 
3. ANALYSIS

 
4. FINANCIAL IMPACT
The requested budget amendment totals $715,000, rounded up from a calculated $710,463.37 in identified new costs. Of that amount, $469,613.37 covers City-driven additions, including the design contribution and joint commission additions, which the City will reimburse to the EDC. The remaining $240,850 represents new project costs not covered by the City, including culverts, the lift station and water/wastewater line increase, the fire sprinkler system, the sculpture base, and the permanent power contingency. The EDC must authorize the full $715,000 upfront to cover contractor costs as they come due, ahead of receiving the City's reimbursement. This amendment brings the New Total Project Cost for Depot on Main to $3,815,000.

 
5. STRATEGIC PLAN/GOALS
 
6. STRATEGIC PLAN OBJECTIVES
 
7. PROS AND CONS

 
8. ALTERNATIVES
 
9. REQUESTED ACTION / SUGGESTED MOTION / RECOMMENDATION

 
Attachments:
 
Depot on Main_Project Budget Summary.docx