Memorandum


REPORT TO:

City Commission

 

FROM:

Ellie Staley, Executive Director Downtown Bozeman Partnership

 

SUBJECT:

Resolution Authorizing Change Order 1 to the City of Bozeman Pedestrian Crossing & Lighting Projects, Main Street Lighting Design Package 3 

 

MEETING DATE:

October 20, 2026

 

AGENDA ITEM TYPE:

Resolution

 

RECOMMENDATION:

A Resolution Authorizing Change Order 1 to the City of Bozeman Pedestrian Crossing & Lighting Projects, Main Street Lighting Design Package 3.

 

STRATEGIC PLAN:

2.2 Infrastructure Investments: Strategically invest in infrastructure as a mechanism to encourage economic development.
 

BACKGROUND:

The City of Bozeman Pedestrian Crossing & Lighting Projects--Main Street Lighting Design Package 3 involves pedestrian lighting improvements along Main Street as part of the Downtown Urban Renewal District’s ongoing effort to improve pedestrian safety, lighting and infrastructure within the downtown district.

 

Attached is a copy of the proposed resolution and Change Order No. 1 for the above-referenced project. This change order includes additional sidewalk removal and replacement, traffic control for the additional work, irrigation pipe sleeves under the new sidewalk, tree trimming adjacent to the sidewalk, and a three-calendar-day contract extension. The additional work results in a net increase of $24,899 to the Schedule IV contract amount, increasing it from $256,452 to $281,351, and extending substantial completion from 90 to 93 days. These additions were requested by the owner as necessary work associated with completion of the project. 

 

City staff and the project engineer have reviewed these changes and associated costs and found them to be necessary and commensurate with the work involved.

 

UNRESOLVED ISSUES:

None

 

ALTERNATIVES:

As recommended by the Commission. 

 

FISCAL EFFECTS:

This change order will increase the contract amount by $24,899.00, bringing the Schedule 4 construction cost from $256,452.00 to $281,351.00, which is within the funding appropriated for the project.

 

 

Attachments:

 
Resolution--MT Lines_MainStLightingpkg3 .pdf
CHANGE ORDER-MT Lines.pdf
 

Report compiled on: October 6, 2026