DATA CENTER ZONING TEXT AMENDMENT OPTIONS
This report outlines several zoning-related follow-up items regarding data centers, which the City Council directed staff to investigate earlier this summer. No final action is being requested by City staff at this meeting.
The City Council held a public forum regarding data center uses in June 2026. The discussion was precipitated by a request from a company named LightEdge for a lease of approximately 10 acres of City land to construct and operate a data center. Data centers vary in size and purpose, but are inclusive of many types of automated data processing and data storage activities, often referred to at the smaller scale as edge or collocate facilities and at the largest scale as hyperscalers for data warehousing and AI training models.
The City has a dedicated webpage for information related to data centers (www.cityofames.org/datacenter) that includes the original public comments, any updates on data center information, and materials from the Resident Data Center Study Committees. It is important to note that since July 2026, there are no ongoing lease negotiations or discussions with LightEdge and the consideration of data center issues is now reflective of data center development in the entire community rather than one specific project.
On July 14, City Council reviewed a report with a summary of public comments and staff responses regarding certain regulatory options for how to address data center development and operations. This report was the basis for additional discussion by the City Council and action steps directed by the City Council on July 28.
On July 28, City Council directed staff to investigate 17 separate topics related to data centers. While these investigations are underway, the Council adopted a resolution for a temporary pause on processing any permits related to data centers until May 1, 2027. Attached are the complete original referred tasks. Staff divided the tasks into three broad categories, described below:
Category 1- Zoning related issues about defining the use, allowable locations, and applicable development regulations. Zoning issues are the focus of this report.
Category 2- Review of the City’s Noise Ordinance for normal and low frequency noises. An initial discussion is planned to occur in December or January.
Category 3- Utility requirements for large electric and water users regarding municipal supplied utilities. This will occur in December or January.
City Council also created a 15-member community task force, known as the Resident Data Center Study Committee, on September 22 to separately review the specific issues regarding heat generation and localized temperature increases, and impacts on wildlife, habitats, and human health. The task force report to the Council is expected in February.
As discussed in July, data centers have a variety of sizes and configurations. There exists in central Iowa a variety of local experiences with all types of data center sizes. Staff’s review of Iowa jurisdictions and national examples has led to a handful of defining characteristics that staff believes are the most important aspects to address with zoning related standards related to issues identified by Council in July.
The more egregious examples of data center incompatibility clearly come from situations where the use was allowed “by right” in an industrial office type of zoning district that also abuts residential zoning. Examples may include facilities within 100-200 feet from a neighborhood with a combination of tall buildings and external cooling and power systems that generate high levels of externalities. A number of good and bad examples come from Loudon County, Virginia and the surrounding area, which has an extraordinarily high concentration of data centers, developed over the past two decades.
Some of the most critical details to address based upon these examples are cooling systems and the use of on-site primary power and backup power generation. With this in mind, siting requirements addressing separation standards are the most critical zoning issue.
As staff worked through options below, it appears that the best default approach is to separate large data centers from residential zoning districts and to apply performance standards. This approach would occur through defining the zoning districts that allow for the use, a size allowance, and also a separation distance from residential zoning as a starting point for addressing compatibility.
Staff also assumes that pertinent building codes, fire codes, and development regulations that apply to other uses will also apply to any data center development, such as storm water management, lighting controls, utility connection requirements, pollution control requirements, and noise standards. Therefore, these topics are not revisited in this report.
Following this general approach allows for a large amount of industrial land to be available for data centers, but excludes commercial areas and areas adjacent to residential zoning districts.
ZONING ISSUES:
Attached are the original zoning related referral items. At the crux of the referrals are these five zoning issues:
- Defining a data center as a use.
- Determining categories, if any, for small versus large data centers.
- Determining the permitting process using either an exclusive special purpose district or a defined unique data center site plan permit, either type approved by City Council.
- Identifying what zoning districts would allow for data centers.
- Development standards that would apply, regardless of permitting process.
As staff has prepared this report, it has reviewed numerous examples and resources from other parts of the country. The University of Iowa is developing a resource library and Georgia Tech has a comprehensive set of resources available online as two example of resources. Within Iowa, there are limited data center ordinances in place, noting an exception for Linn County and Palo. Generally, there has been more activity by counties in Iowa than cities regarding data center development.
However, staff is aware that Clinton, Iowa is on a similar path as Ames and is in the process of developing a comprehensive data center ordinance to address a proposed large hyperscale campus by QTS. Norwalk, Iowa is also looking to establish a specific ordinance, even though they have already approved a data center for development. Staff focused on city or urban development based ordinances and examples in preparation of this report.
Zoning Issue 1: Data Center Definition
Currently, modern data centers are not well defined in the Zoning Ordinance. The Planning Director has made an interpretation that the use aligns with an Industrial Use category of processing versus an office use category of data processing utilizing personnel. The City needs to create a definition of a data center in the Zoning Ordinance to appropriately regulate the use.
At the time of creating a pause on permitting of data centers, the enacting resolution included the following definition:
WHEREAS, for purposes of this Resolution, “data centers” are defined as “facilities whose primary service is data processing or data storage, and is used to house computer systems and associated components, such as central processing units, graphical processing units, neural networks, quantum bits, quantum processors, memory, data routing, data storage, server farm, crypto currency mining or processing, virtual private networks, virtual servers, artificial intelligence (AI) training or processing, image processing, cloud computing, email servicing, or any other term applicable to facilities which are used for such purposes shall be deemed to be a data center. Data processing as an accessory use to a principal use in the same building is limited to a maximum of 10,000 square feet in order not to be considered a primary use.”
Staff has reviewed a number of ordinances with definitions of data centers as principal and accessory uses. Staff believes the definition above is inclusive of activities commonly associated with data center functions and is appropriate to use as a principal use definition.
Regarding accessory functions to a principal use, meaning it is not the primary use of a building and provides support to the company within the building, the above definition referencing 10,000 square feet may be adjusted to fit other decisions regarding the data center use. The final accessory definition will need to have a defined standard for staff to evaluate based upon size or proportion of a building. The definition will also need to clarify that the function of the data center is not for the purpose of renting or leasing out services to other businesses and can only serve the business operating in the building with an allowed primary use.
At the time of finalizing the definitions, accessory functions and equipment of data centers will also need to be addressed. For example, how electric substations are permitted and how power generation as a primary function or a backup function is accounted for in the permitting process.
Staff thinks it is also critical that with either the definition of the use or with the development standard, it is important to establish 1) a limitation on the onsite primary power generation and 2) that either a closed loop cooling system or other high efficiency use of potable water for cooling is required. Staff addresses this in more detail later.
| Recommendation #1: Staff recommends moving forward the current definition provided above along with planned updates as needed, especially for accessory uses. |
Zoning Issue 2: Data Center Categories
Data centers cover a broad spectrum of business activities, with different scales of activities and building sizes. Historically, data center activities were synonymous with communication for phone companies, fiber companies, and wireless companies. For example, a telephone exchange building is an example of a data center function that would be included with the data center definition. These activities changed with the advent of the cloud and more remote computing capabilities as technology and speeds improved.
Based upon public input and staff assessment of common use concerns, the larger a building or a greater concentration of buildings does correlate to concerns regarding resource use and land use compatibility. Companies utilize a variety of terms for different business models, but the following are generally used to describe these facilities, from smallest to largest. Purposes can overlap between the types.
Edge Data Centers are small distributed facilities intended to be located near the customer to assist in speeding up data services and reducing latency. Staff does not have a local example to reference for this scale of use.
Colocation Data Centers can provide edge services to a company, but they also have a primary model of leasing or renting data processing equipment and services to local or regional companies where proximity to the service is valuable. They typically are a single building and can vary in size from 30,000 to 100,000+ square feet.
The LightEdge business from the summer of 2026 was a colocation business model with 30,000 to 50,000 square foot buildings referenced as examples in Altoona. Numerous other examples exist in the Metro area (e.g., Oppidan's 60,000 square foot facility in Des Moines and an Edged Des Moines facility recently opened in Ankeny on Four Mile Road that is over 100,000 square feet). Typically, the facility processing capacity within a building shell is built out in phases based upon customer demands for service.
While no hard and fast definition exists for water and electric use for these facilities, it would be common to rely on air cooling or closed loop cooling systems compared to the use of large amounts of water with evaporative cooling due to the smaller size and scale. Staff estimates a general range of electric demand of between 3 Megawatts and 15 Megawatts, per facility of this type.
Hyperscaler Data Centers, for this discussion, are inclusive of AI training, cloud computing, and data warehousing that occurs by a single user on an extremely large scale, usually as a campus of buildings. However, there are purpose-built facilities operated by large companies (e.g., Microsoft, Meta, and Apple), and data center development companies that build facilities for companies (e.g., QTS operates in Iowa developing large scale facilities).
Iowa has many examples of these types of facilities. The most significant facility near Ames is the Meta campus located in Altoona, which has been in development for over 10 years and includes over 600 acres and 5.5 million square feet of data center floor area with an assessed value exceeding $1 billion dollars. Other major facilities include the Microsoft facilities in West Des Moines, Google in Council Bluffs, and the Apple facility under construction in Waukee. All of these projects have different approaches to individual building design and size, but the overall magnitude of buildings and campus size distinguishes this use from other data centers.
Facilities of this type will typically have individual one-story buildings of 200,000+ square feet ranging up to very large building footprints that include mezzanine levels totaling 600,000 square per building. Individual resource uses of water and electricity are not always known for these facilities, but in terms of scale the Meta Campus powered by MidAmerican Energy has been reported to exceed 1 Gigawatt of power.
Water usage is not typically released on a customer basis and the issue of cooling system type is the defining feature in regard to water consumption. West Des Moines indicated that Microsoft was not a top 25 water user within its City and that data centers utilized 2.4% of the city's overall water usage in 2025. However, examples for large facilities in other locations that rely upon evaporative cooling use millions of gallons a day for cooling and require substantial infrastructure investments to serve them. Cedar Rapids has an example of a Google facility utilizing large volumes of water and a QTS facility relying on a closed loop type of facility with minimal water use.
These facilities are typically purpose-built for a hyperscaler business and will be multi-building campuses that can be built out over a 5-10 year timeframe. One of the most important issues to manage with hyperscale facility buildout is the temporary construction impacts related to the high volume of workers and potential impacts to public infrastructure during development. This issue is addressed with later recommendations related to permitting.
|
Recommendation #2: Define a collocate type of facility separately from a large hyperscaler facility, under the presumption that a more streamlined permitting process would apply to smaller facilities. A collocate facility exceeds neither a 100,000 square foot size limitation or a 10MW designed electric demand.
Additionally, a colocation type of facility would also require a separation distance of 500 feet between properties that contain a data center.
All data centers that do not meet the above standards would be treated as large scale facilities whether they are one building or a campus. |
| Recommendation #3: If Council supports #2, defining a combination of buildings and land under common ownership as a large facility would be required to avoid piecemealing. |
|
Recommendation #4: If City Council does not want to distinguish data center size for permitting purposes, staff does not recommend any additional sizing or definitional terms as all sizes of facilities will have the same permitting requirements and process. |
Zoning Issue 3: Data Center Permitting
The City could establish a new permit process for data center major Site Plan approval or a separate zoning district for data centers using a rezoning process for a Special Purpose zoning district.
Staff believes that either of these options would include a public hearing process with City Council approval. A public hearing would be mandatory with any required rezoning.
The City’s Major Site Development Plan approval process requires City Council approval and includes courtesy notice to adjacent residents, but is not a formal public hearing.
Each option will need to define the expected application requirements that augment existing requirements in order to address the unique concerns and characteristics of data centers.
The fundamental difference between a Site Plan approach and a rezoning approach to a Special Purpose District is the predictability of the process related to the criteria of approval. Generally, Site Plan approval criteria focus on physical aspects of a project, whereas a rezoning approach considers physical and other policy interests of the City, generally defined through the Ames Plan 2040 Comprehensive Plan.
Generally, cities balance the need for predictability and attractiveness of development options to a potential customer with the needs for public awareness, time requirements, and decision-making discretion when determining the appropriate level of permitting process.
Either version of permitting would require a project narrative and description of use, detailed site plans, building plans, landscaping plans, utility plans, use analysis report, lighting plans, and stormwater management plans as is required today.
In addition, staff believes other information must be explicitly required to comprehensively assess a proposed data center.
Additional details include:
- cooling system specifications,
- backup generator, fuel type, and battery specifications,
- noise assessment,
- community benefit and infrastructure agreements, if needed
- written verification by power provider of available capacity,
- identification of electric service equipment needed on and offsite, e.g., substations, switch gear, transmission line routes,
- water usage study,
- construction traffic study and management if needed.
- security and fencing plan
- establish commensurate application fees and peer review consultant fees to be paid by the applicant
Once the application requirements are set, approval criteria for a data center rezoning process or site plan permit will be needed that provide greater clarity than existing permitting processes for unique data center issues to approve or disapprove a proposal. Potentially, cumulative issues of nearby facilities will also need to be considered with a proposal.
|
Recommendation #5: Determine whether to pursue a rezoning to a Special Purpose District process or a special data center Site Plan approval process and include additional application requirements listed above.
Staff recommends that if there are two types of facilities, that a large facility automatically requires a Special Purpose District zoning for approval. A collocate facility would then require a data center Site Plan. |
| Recommendation #6: Augment current approval criteria to address unique aspects of data centers and update the infrastructure utility impact language that currently focuses on line-capacity and not overall supply capacity. Note that this issue from a cost perspective will be addressed in the Utility issues discussion in January. |
Zoning Issue 4: Allowed Zoning Districts
Establishing where the use is allowed sets the basic development and permitting process for a data center as is the case for all uses in the City. Due to data center attributes of 1) low employee and customer activity, 2) size, and 3) scale of facilities, staff believes data centers should only be permitted with industrial zones where similar types of activities may already be permitted. Additionally, a separation requirement regardless of zoning district should apply to provide buffer of use from nearby residential zoning districts.
Ames currently has four industrial zoning districts: General Industrial (GI), Planned Industrial (PI), Research Park and Innovation District (RI), and Intensive Industrial (II). A map depicting the industrial zones with a 1,000 foot buffer from residential zones is attached. When considering location and purpose of the four industrial zoning districts, staff believes that the base zones of II and GI are the most appropriate locations for any type of data center, whether collocate or larger size facilities.
There are approximately 1,200 acres of land in the Prairie View Industrial Park east of I-35 primarily planned for II zoning, most of which is undeveloped at this time. This area was brought into the city for the primary purpose of expanding large industrial development opportunities. Prairie View is served by City of Ames water and sewer infrastructure. However, both electric and natural gas service is provided by Alliant Energy.
GI is a legacy industrial zoning district that applies to most of the east side of the city and it includes small industrial and services uses and large manufacturing facilities like 3M and Danfoss.
PI zoning also allows for large facilities, but is primarily office and R&D, and does not permit smaller industrial and service uses.
RI zoning is uniquely created for the ISURP with a mix of office, R&D, commercial, and residential uses. The City of Ames is the electric, water, and sewer provider for almost all of the land within the GI, PI, and RI zoning districts.
Both PI and RI are adjacent to residential zoning districts. GI is mostly isolated from residential, with the exception of a cluster of mobile home parks along South Dayton Place. II has no adjacent residential zoning or planned residential zoning between HWY 30 and the Union Pacific Railroad.
An alternative to setting a base zone that accommodates the data center uses is to only apply a new special purpose district, as the only zoning option for siting a data center, see Issue 3 above.
Staff believes a 1,000 foot separation distance from residential zoning creates a substantial and cautious buffer related to operational concerns of a data center. A separation distances could be reduced depending on other standards that may be adopted related to building setbacks, power generation, cooling systems. Staff has not seen a rationale for larger separation distances from residential zoning districts within cities if other standards are also applied, primarily for noise mitigation.
|
Recommendation #7: Allow collocate facilities only within GI or II zoning districts and require a 1,000 foot buffer of a data center site from residential zoning districts regardless of its base zoning district, subject to Council approval of a data center Site Plan. |
|
Recommendation #8: Require large facilities to only be located within a Special Purpose District approved through a rezoning process by the City Council. (Note if there is no size differentiation, all data centers would use this process)
Within a Special Purpose District zone, it would include the minimum 1,000-foot separation requirement and additional permitting requirements and standards. |
Zoning Issue 5: Development Standards
Staff has articulated above that a 1,000 foot separation requirement from residential zoning districts should be required for data center facilities.
Other current development requirements warrant revision for data center types of facilities. The City’s current industrial standards are design to accommodate a wide range of facilities and have minimal design expectations due to the various types of uses and size of uses. At a minimum, site setbacks need to be increased to create space for design and compatibility features. Current front setbacks are as little as 10 feet in GI.
Staff believes front setbacks of a minimum of 100 feet for landscaping purposes, exclusive of power line transmission easements, is desirable with greater setbacks for larger campuses. Additionally, staff is advocating side and rear setbacks at a minimum of 50 feet with no allowance for encroachment of HVAC, accessory structures, and backup power generators unless authorized via City Council approval.
Landscaping standards will require parking lot and front yard landscaping. Staff believes use of berms and other decorative landscaping features will be desirable along with requirements that security fencing be set behind front yard landscaping. The Meta Campus in Altoona is an outstanding example of a large campus facility with excellent perimeter buffering and overall aesthetics.
Data center building design varies greatly. There are currently no design requirements in GI or II for building materials or architecture. Staff believes that building material guidelines of tilt-up concrete or other masonry and architectural grade building systems be required in lieu of allowing prefab metal buildings and other less-substantive building designs, subject to the Council approval process.
Height limits have a unique regulatory value for this type of use due to the stacking of equipment inside of the buildings and ensuring the use is consistent with projected electric and water usage. Collocate facilities should be one story (20 feet) and potentially allow for a mezzanine level. Large facilities could be one story or taller as is the case with the Altoona Meta facility. Some facilities will locate HVAC within buildings and on upper floors to mitigate noise and address space constraints, for these large facilities height limits of up to 75 feet is proposed.
As mentioned earlier within the definition section, the standards need to address operational and auxiliary aspects of the use. The City can specify a requirement for a highly efficient potable water or air cooled system compared to an evaporative system that consumes large amounts of potable water. This expectation is supplemented by the application process requirement to designated the cooling system type and a water supply study to address the operations of the facility.
Power generation has two concerns: potential noise and localized pollution. Backup generators are permitted by the DNR and limited to operation of 100 hours per year for testing and other purposes. Actual use in an emergency of lost power has no annual limit. The City Council may want to consider limiting the number of backup generator capacity to match projected power demand as a check and balance in projected electric load demand is also possible.
Some data centers have pursued installation of their own primary power generation to alleviate concerns of power from the grid. These types of generators are natural gas fired or diesel fueled generators that require permitting under the Clean Air Act by the EPA and DNR. A Small Modular Reactor (SMR) concept for nuclear power is also on the market and could become more prevalent as an on-site energy source. Staff believes that primary power generators are not appropriate within the City of Ames and proposes to restrict any type of generator used for primary power purposes.
|
Recommendation #9:
|
- Direct staff to place this item on the December 15, 2026 Council agenda to provide direction to staff to draft zoning ordinance amendments.
Following the December meeting, Staff would then prepare a draft ordinance for public review, set a Planning and Zoning Commission hearing date, present a final draft to City Council, and then set a date of hearing for final approval of an ordinance amendment zoning and development standards. - Direct staff to provide additional information in conjunction with the future discussion.
- Provide other direction to staff regarding how to proceed.
Data centers are a complex issue because of the variety of types of businesses and the context in which they may operate in an urban environment. Staff has identified what it believes are the minimum zoning standards and permitting process needed to address concerns identified in July.
The key issue for Council is to determine a preferred approval process (Recommendation #5), and then to apply updated definitions and standards as discussed in this report. Staff has consolidated the recommendations within the body of the report into an attachment for easier tracking of the specifics.
No final action is requested at this meeting. This report serves as a restart of the data center conversation and refresher regarding issues that were previously discussed.
Consistent with the original timeline to complete updated ordinances in the spring of 2027, December 15 would be the next available meeting date to for the City Council to provide final direction on how to proceed. Therefore, it is the recommendation of the City Manager that the City Council adopts Alternative #1, as described above.