General Plan Mobility Element Implementation


RECOMMENDATION

Receive and file a presentation analyzing east-west road alignment alternatives.


CONTACT

Jason Holley, CIty Manager


BACKGROUND & ANALYSIS

State Route 29 (SR 29) is the principal north-south regional connection between the North Bay Interior Valleys and the East Bay. The Napa Valley Transportation Authority (NVTA) and Caltrans are advancing SR 29 corridor improvements to address operations, safety, and multimodal mobility (i.e. "SR 29 Corridor Improvement Project"). In February 2026, the NVTA selected the signalized alternative as part of the "Project Approval and Environmental Document" (PAED), which is a critical phase in the Caltrans Project Development Procedures Manual.  NVTA expects the PAED phase to conclude in early Q2 of 2027.

 

SR 29 plays an equally important role locally.  Separately, but in tandem with the PAED phase, the City is analyzing the best way to connect to the Watson Ranch development east of SR 29. The intention is to mirror the connectively that exists with the development west of SR 29.  

 

Since April 2026, Kimley-Horn and Associates (KHA) has been analyzing potential intersection and roadway configurations of roads such as Newell Drive, Eucalyptus Drive, Main Street Rio Del Mar, and South Napa Junction Road. Of note, KHA is also separately undertaking the above described work with NVTA.

 

RELATIONSHIP TO ADOPTED PLANS

 

Three recent City planning tools each retain the optionality of two different east-west local street alternatives (Rio Del Mar East or South Napa Junction). Given NVTA will be proceeding with the next phase of the SR 29 Project soon, it is important for the CIty to select which alternative will proceed.     

 

The General Plan Mobility Element (2025) identifies Rio Del Mar or South Napa Junction (MOB Table 3) as a future east-west connection between SR 29 and Newell Drive, including an at-grade railroad crossing. It also emphasizes coordinated SR 29 improvements, complete streets, and regional connectivity (pp. M-16–M-17).

 

The Watson Ranch Specific Plan (2023) also identifies Rio Del Mar East as a principal connection from the Watson Ranch to SR 29 (Figure 7.1)   The Plan addresses railroad-crossing design, off-site improvements and access/phasing requirements (Sections 7.3, 7.7 and 9.3). An associated development agreement also contemplates South Napa Junction as the alternative to Rio Del Mar.

 

The Broadway District Specific Plan (2022) contemplates extending Main Street south from its current terminus to Donaldson Way and designing its segment between Rio Del Mar and South Napa Junction as a pedestrian-oriented “family” street (p. 2-13). Chapter 4 emphasizes safe east-west crossings of Broadway, including the River to Ridge Trail and access at Eucalyptus, Rio Del Mar and South Napa Junction (pp. 4-6, 4-13). 

 

ANALYSIS

 

With the concurrence of the Circulation Ad-Hoc Subcommittee (Joseph/Oro), KHA evaluated eight configurations of the SR 29 intersections at Eucalyptus Drive, Rio Del Mar, and South Napa Junction Road. Each was assessed both with and without the contemplated Main Street connection to South Napa Junction Road, for a total of 16 scenarios.


The scenarios generally compare retaining a three-legged Rio Del Mar/SR 29 intersection with an east-west connection via South Napa Junction Road against extending Rio Del Mar across the railroad toward Newell Drive to form a four-legged intersection. The study also considers signalized and unsignalized intersection combinations.


Using a weighted, multi-criteria approach, KHA compared traffic operations, multimodal safety and connectivity, east-west circulation, right-of-way and railroad-crossing needs, environmental constraints, relative costs, and implementation considerations. The study is a planning-level comparison, not a final engineering design or project approval.

 

KHA will present their findings along with the supporting presentation provided as Attachment 1. The analysis may help inform future transportation planning, but this item does not select an alternative or change any adopted plan.  Any future advancement of a roadway configuration, including possible changes to an adopted plan, would require separate consideration of applicable land use entitlements, technical studies, agency approvals, funding, and environmental review.

 

NEXT STEPS

 

The purpose of the analysis is to confirm to which alternative (Rio Del Mar or South Napa Junction) will move forward.  The Council is not being asked to make a final decision.  Instead, staff request direction for which alternative to bring back for ratification.  Once clear direction is received and community engagement is undertaken, staff will return to Council with the requisite General and Special Plan Amendments.   This will occur after NVTA concludes the PAED phase - likely mid-Q2 2027.


COUNCIL PRIORITY PROGRAMS AND PROJECTS
Transportation: "Improve the transportation network within the City to alleviate congestion and enhance the quality of life for the community."

FISCAL IMPACT

Not applicable.


ENVIRONMENTAL REVIEW
15378(b) - The action is not a "Project" subject to the California Environmental Quality Act ("CEQA") because it does not qualify as a "Project" under Public Resources Code Sections 21065 and 21080 and in Section 15378(b) of Title 14 of the California Code of Regulations.

COMMUNICATION
Level 2: Targeted Communication

Future communications will be targeted to residents in the neighborhoods north of Donaldson Way and West of SR 29.  This will include a community meeting in Spring 2027.


ATTACHMENTS:
1. Presentation